Bathroom Remodeling Part 3

Then, after the inspections were done, the fun stuff started.  First the drywall came in (after they shoved a bit of insulation in the spaces)


And then a new cabinet was installed - we opened up the wall to the hallway (which had been closed off in the old configuration) so we can access the bathroom cabinet from either the hallway or inside of the bathroom itself


Then the painting happened - and things are starting to take shape - this is from the inside looking out - we kept the same green color on the walls, but added a nice soft white to the trim as a finish

from the outside hallway looking in, we painted the trim the same as the rest of the hallway








3 comments:

Muhammad Hassan said...

With bathroom renovating, it's critical that you just keep one thing in brain. Several of us have several understandings, with respect to the meaning of remodeling. bathroom remodelers in Irwindale

Linda Mason said...

It makes no noise as it works which is something to be considered professor amos superfast drain cleaner

Unknown said...

Thanks, that was a really cool read! Read here

Tree Planting - November 14, 2009 - Omaha Street Parkway