Once everything was ripped out, then the reconstruction could begin, starting with a new outside wall and a new window


The tub is gone, as you can see (no easy feat - Ben hauled it out of there by himself and I hope to golly he didn't hurt himself in the process) and then a shower had to be rebuilt where the tub was.


They used self-leveling cement to build the shower stall floor.  The "chimney" in the center is keeping the plumbing drain open and cement free.

The electrician and plumbers then came in and re-did all the wiring (old knob and tube got an upgrade) and water lines (old galvanized out and pex came in)